- 1. Design consultStyle, glass, thickness, hardware and finish chosen for your space, budget and cleaning habits.
- 2. Field measureAfter tile is finished: widths, heights, plumb, level, curb slope and wall blocking checked.
- 3. FabricationGlass cut, edged, drilled and notched, then tempered. Often one to three weeks.
- 4. InstallationHardware set, panels placed on setting blocks, door hung and adjusted. Often a few hours.
- 5. Seal & cureSilicone where specified, with a cure time before the first shower.
- 6. Care walkthroughCleaning, squeegee habits, coating care and hinge adjustment.
What you should receive
- A written quote with glass type, thickness, finish and configuration.
- A drawing or measurement sheet for custom glass.
- Warranty terms for glass, hardware and labor.

Ready to start? Request a quote, or use the price estimator first.



