Shower enclosure installation, step by step

What happens on installation day, and how to make sure the job is done right.

Shower enclosure installation, step by step

Before installation

  • Tile, grout and stone must be finished and cured.
  • Heavy frameless doors need solid blocking (wood or metal) behind the tile at the hinge locations. Plan this before tiling.
  • Clear the bathroom and the path from the front door.

Typical installation steps

  1. Layout: the installer marks hinge, clamp and channel positions.
  2. Drilling: holes are drilled through tile with diamond bits, then anchors set.
  3. Fixed panels: set in clamps or channel, plumbed and shimmed.
  4. Door: hung on hinges, adjusted for even gaps and a smooth swing.
  5. Seals and sweeps: fitted to edges.
  6. Silicone: applied to fixed panel joints, not the door.

Most installations take 2–4 hours.

After installation

  • Wait 24 hours before showering, so the silicone can cure.
  • Check the door swings freely and closes evenly.
  • Look for tempering marks on every panel.
  • Ask for care instructions and warranty details in writing.
Don't try to lift or install heavy frameless glass on your own. Panels can weigh more than 100 lb, and tempered glass can shatter if an edge is struck.